Biomass-fired CHP Plant
In the main building of the mini-CHP, it is planned to install four steam boilers with a capacity of 25 tons of steam per hour each with pre-furnaces for burning bark and wood waste and steam turbine TWIN AA44 - Mono AFA6 - Combi with an electric power of 8 MW. Superheated steam from the boilers is fed to a steam turbine unit equipped with three pressure steam selections. From the steam turbine plant selection, superheated steam is supplied to the technological needs of the enterprise, the heat supply system of the enterprise and the nearby village, the own needs of the mini-thermal power station, and the water heating system in hydrothermal treatment pools.
The project also envisages the construction of a new mechanized chip storage (20,000 m3 of chips), an automated distribution warehouse for supplying fuel to mini-CHP plants and a system of chip and dust pipelines with the total length of about 3 km.
Services
• Architectural Design
• Structural Design
• Main Equipment selection
• Piping design
• Electrical Design
• Automation & Control (Eplan)
• HVAC Systems design
• Construction Supervision
BIM Implementation
Considering the project complexity, all the main structures and systems were modeled in Revit with up to LOD 400. Architectural, Structural, MEP and Process Engineering models were put together in one integral model for BIM Coordination. It has ensured smooth workflow, more optimal design solutions and client involvement in the design process at all design stages.

Based on their experience, I can recommend Eneca.

We appreciate Eneca’s readiness to support us with BIM modeling on short notice, as well as their flexibility in providing the necessary resources to meet a strict deadline. All modeling was completed within two weeks, with a division into lots. Eneca’s specialists were always willing to take the time to discuss our concerns and accommodate additional requests.
Eneca’s strong expertise in Revit and professional experience in structural design enabled their team to quickly grasp Implenia’s high modeling requirements. The BIM model was developed in accordance with the 3D BKP Model guidelines and Implenia’s standards, ensuring compliance with parameter and element naming rules as per Baukostenplan Hochbau. Eneca’s detail-oriented and structured approach contributed to the creation of a high-quality BKP model aimed at automating the calculation of construction volumes and costs.
I am pleased with the quality of services provided by ENECA and can confidently recommend them to others in need of similar BIM modeling services.

The design process always requires flexibility and capability to think differently, and we were pleased to see Eneca’s readiness to support us and solve all the project issues together. When there was a need to do some quick revisions at a very late stage, Eneca's specialists performed them in a high qualitative and timely manner. The technical competence and deep Tekla knowledge of Eneca’s team as well as their high-performance efficiency and always keen in continuous improvement, provided us an important support in our engineering process.
30.07.2021