Energy Center with CO2 Production
Year
2018
Type
Infrastructural facilities


Category
Transformer substations and power lines

Energy Center with CO2 Production

Design and Construction project for  an Energy Center with Electricity, Heat Supply Systems, and CO2 Production of at Least 800 kg/h

The energy center is designed to supply an agricultural complex with electricity, heat, and carbon dioxide (CO2).

Electricity Production:
Installed nominal electric capacity: 24 MW
Output voltage: 10.5 kV ±10%
Current type: Alternating, three-phase
Frequency: 50 Hz
Voltage for internal energy center systems: 0.4/0.23 kV
Operating mode: Synchronous, parallel operation with the external power grid

Heat Production:
Installed thermal capacity: 65 MW
Heat carrier: Hot water, operating on a 95/70°C temperature gradient in a two-pipe system.

CO2 Production:
Output: 800 kg/h
This facility is designed to provide integrated energy solutions, ensuring reliable power and heat supply while supporting CO2 production for agricultural applications
.


img
img
img
img
img
img
img
img
img
they trust us
Client
Swisslux AG
Location
Under NDA
To make it easier for our customers to take the step into the future of construction, we found a competent and reliable partner in Eneca who understood our needs and was able to implement them quickly. As part of our order, Eneca took over the development of 56 parameterized lighting families in Revit with a high level of detail and information. All models were created in the three national languages ​​and in two formats each using Revit script. This means that future adjustments can also be implemented easily and without any problems. The Eneca team works professionally, quickly and precisely, which underlines their competence in BIM.
Based on their experience, I can recommend Eneca.
Client
Implenia Schweiz AG
Location
Under NDA
We collaborated with Eneca to create a structural Revit model of a residential complex with a floor area of 41,571 m², consisting of six three-story residential buildings with an underground parking garage, based on 2D drawings.

We appreciate Eneca’s readiness to support us with BIM modeling on short notice, as well as their flexibility in providing the necessary resources to meet a strict deadline. All modeling was completed within two weeks, with a division into lots. Eneca’s specialists were always willing to take the time to discuss our concerns and accommodate additional requests.

Eneca’s strong expertise in Revit and professional experience in structural design enabled their team to quickly grasp Implenia’s high modeling requirements. The BIM model was developed in accordance with the 3D BKP Model guidelines and Implenia’s standards, ensuring compliance with parameter and element naming rules as per Baukostenplan Hochbau. Eneca’s detail-oriented and structured approach contributed to the creation of a high-quality BKP model aimed at automating the calculation of construction volumes and costs.

I am pleased with the quality of services provided by ENECA and can confidently recommend them to others in need of similar BIM modeling services. 


Client
ASK Romein Staalbouw BV
Location
Under NDA
We have been working closely with Eneca since June 2020. Eneca has proved itself as a trustworthy and responsible partner in steel structural design. We have accomplished more than 10 project areas together and discussed for some other future opportunities. Their engineering team is located abroad, however, the remote work is well-organized.

The design process always requires flexibility and capability to think differently, and we were pleased to see Eneca’s readiness to support us and solve all the project issues together. When there was a need to do some quick revisions at a very late stage, Eneca's specialists performed them in a high qualitative and timely manner. The technical competence and deep Tekla knowledge of Eneca’s team as well as their high-performance efficiency and always keen in continuous improvement, provided us an important support in our engineering process.

30.07.2021