Installation for Landfill Gas Recovery
Design documentation for Installation of Landfill Gas Recovery and Electricity and Heat Generation System .
The project involves installing a biogas complex for recovering landfill gas from the solid waste landfill body and generating electricity and heat (heat is dissipated through dry cooling towers) through regeneration in a cogeneration unit (CHP block-container).
The complex layout includes: a CHP block-container equipped with a gas piston generator; a gas compressor unit block-container; an open-type transformer substation; a flare stack; condensate and blow-down wells; and the construction of a gas pipeline system and gas wells.
The biogas plant generates 835 kW of electricity.
The biogas complex produces 835 kW/h of 10 kV electricity.

Based on their experience, I can recommend Eneca.

We appreciate Eneca’s readiness to support us with BIM modeling on short notice, as well as their flexibility in providing the necessary resources to meet a strict deadline. All modeling was completed within two weeks, with a division into lots. Eneca’s specialists were always willing to take the time to discuss our concerns and accommodate additional requests.
Eneca’s strong expertise in Revit and professional experience in structural design enabled their team to quickly grasp Implenia’s high modeling requirements. The BIM model was developed in accordance with the 3D BKP Model guidelines and Implenia’s standards, ensuring compliance with parameter and element naming rules as per Baukostenplan Hochbau. Eneca’s detail-oriented and structured approach contributed to the creation of a high-quality BKP model aimed at automating the calculation of construction volumes and costs.
I am pleased with the quality of services provided by ENECA and can confidently recommend them to others in need of similar BIM modeling services.

The design process always requires flexibility and capability to think differently, and we were pleased to see Eneca’s readiness to support us and solve all the project issues together. When there was a need to do some quick revisions at a very late stage, Eneca's specialists performed them in a high qualitative and timely manner. The technical competence and deep Tekla knowledge of Eneca’s team as well as their high-performance efficiency and always keen in continuous improvement, provided us an important support in our engineering process.
30.07.2021