Boiler house in Greece
The project outstands with the synchronized parallel work of several contractors - electricians, equipment engineers, etc. In addition, static calculations and the geometry of the structures often needed revising.
Structural scope:
Steel structures - 282 tons
Software:
- Tekla
- Dlubal RFEM
- IDEAStatiCa
- Structural Analysis
- Connection calculation
- Modeling,
- GA drawings
- Workshop drawings
- Erection drawings
Based on their experience, I can recommend Eneca.
We worked with Eneca to create a structural Revit model of a residential complex having the floor area of 41 571 qm and consisting of 6 three-storey residential buildings with an underground car park out of 2D drawings.
We appreciate the readiness of Eneca to support us in BIM-modelling at a short notice, as well as their flexibility in providing us with the resources needed to meet a strict deadline. All the modelling was done with the division into lots in a short time within 2 weeks. Eneca’s specialists were always willing to take the time to discuss our concerns and work out additional requests.
The good knowledge of Revit and professional experience in structural design allowed Eneca’s team to quickly grasp high Implenia's modelling requirements. The BIM model was created according to 3D BKP Model guidelines and standards of Implenia including compliance to the parameters and element naming rules according to Baukostenplan Hochbau. The Eneca’s detail-oriented and organized approach helped to create a high-quality BKP model aimed at automating the calculation of construction volumes and costs.
I am pleased with the quality of the services ENECA provides. Thus, I can recommend them to others in need of similar BIM modelling services.
10 project areas together and discussed for some other future opportunities. Their engineering team is located abroad, however, the remote work is well-organized.
The design process always requires flexibility and capability to think differently, and we were pleased to see Eneca’s readiness to support us and solve all the project issues together. When there was a need to do some quick revisions at a very late stage, Eneca's specialists performed them in a high qualitative and timely manner. The technical competence and deep Tekla knowledge of Eneca’s team as well as their high-performance efficiency and always keen in continuous improvement, provided us an important support in our engineering process.
30.07.2021