Custom Modular Boiler House

Custom-designed modular boiler house

The boiler house is uniquely constructed in a modular configuration, featuring a robust steel framework. The external wall structures are composed of prefabricated, three-layer fire-resistant panels filled with mineral wool, providing both thermal insulation and fire safety. The flooring within the boiler house is also insulated to enhance energy efficiency.

Key Features:

  • Gas Condensing Water Boilers: Three high-efficiency gas condensing boilers with a thermal capacity of 466.7 kW each, ensuring optimal energy utilization.
  • Steam Boiler: A steam boiler with a production capacity of 460 kg/h, designed to support various industrial processes.

Calculated Thermal Loads:

  • Heating: 293 kW
  • Ventilation: 960 kW
  • Hot Water Supply: 145 kW
  • Steam Supply for Technological Needs: 460 kg/h

Information Model Detail Level: LOD 300-350

Fuel Type: Natural gas

Total Capacity: 1 MW



img
img
img
they trust us
Client
Swisslux AG
Location
Under NDA
To make it easier for our customers to take the step into the future of construction, we found a competent and reliable partner in Eneca who understood our needs and was able to implement them quickly. As part of our order, Eneca took over the development of 56 parameterized lighting families in Revit with a high level of detail and information. All models were created in the three national languages ​​and in two formats each using Revit script. This means that future adjustments can also be implemented easily and without any problems. The Eneca team works professionally, quickly and precisely, which underlines their competence in BIM.
Based on their experience, I can recommend Eneca.
Client
Implenia Schweiz AG
Location
Under NDA
We collaborated with Eneca to create a structural Revit model of a residential complex with a floor area of 41,571 m², consisting of six three-story residential buildings with an underground parking garage, based on 2D drawings.

We appreciate Eneca’s readiness to support us with BIM modeling on short notice, as well as their flexibility in providing the necessary resources to meet a strict deadline. All modeling was completed within two weeks, with a division into lots. Eneca’s specialists were always willing to take the time to discuss our concerns and accommodate additional requests.

Eneca’s strong expertise in Revit and professional experience in structural design enabled their team to quickly grasp Implenia’s high modeling requirements. The BIM model was developed in accordance with the 3D BKP Model guidelines and Implenia’s standards, ensuring compliance with parameter and element naming rules as per Baukostenplan Hochbau. Eneca’s detail-oriented and structured approach contributed to the creation of a high-quality BKP model aimed at automating the calculation of construction volumes and costs.

I am pleased with the quality of services provided by ENECA and can confidently recommend them to others in need of similar BIM modeling services. 


Client
ASK Romein Staalbouw BV
Location
Under NDA
We have been working closely with Eneca since June 2020. Eneca has proved itself as a trustworthy and responsible partner in steel structural design. We have accomplished more than 10 project areas together and discussed for some other future opportunities. Their engineering team is located abroad, however, the remote work is well-organized.

The design process always requires flexibility and capability to think differently, and we were pleased to see Eneca’s readiness to support us and solve all the project issues together. When there was a need to do some quick revisions at a very late stage, Eneca's specialists performed them in a high qualitative and timely manner. The technical competence and deep Tekla knowledge of Eneca’s team as well as their high-performance efficiency and always keen in continuous improvement, provided us an important support in our engineering process.

30.07.2021