Installation for Landfill Gas Recovery
Design documentation for Installation of Landfill Gas Recovery and Electricity and Heat Generation System .
The project involves installing a biogas complex for recovering landfill gas from the solid waste landfill body and generating electricity and heat (heat is dissipated through dry cooling towers) through regeneration in a cogeneration unit (CHP block-container).
The complex layout includes: a CHP block-container equipped with a gas piston generator; a gas compressor unit block-container; an open-type transformer substation; a flare stack; condensate and blow-down wells; and the construction of a gas pipeline system and gas wells.
The biogas plant generates 835 kW of electricity.
The biogas complex produces 835 kW/h of 10 kV electricity.
Based on their experience, I can recommend Eneca.
We worked with Eneca to create a structural Revit model of a residential complex having the floor area of 41 571 qm and consisting of 6 three-storey residential buildings with an underground car park out of 2D drawings.
We appreciate the readiness of Eneca to support us in BIM-modelling at a short notice, as well as their flexibility in providing us with the resources needed to meet a strict deadline. All the modelling was done with the division into lots in a short time within 2 weeks. Eneca’s specialists were always willing to take the time to discuss our concerns and work out additional requests.
The good knowledge of Revit and professional experience in structural design allowed Eneca’s team to quickly grasp high Implenia's modelling requirements. The BIM model was created according to 3D BKP Model guidelines and standards of Implenia including compliance to the parameters and element naming rules according to Baukostenplan Hochbau. The Eneca’s detail-oriented and organized approach helped to create a high-quality BKP model aimed at automating the calculation of construction volumes and costs.
I am pleased with the quality of the services ENECA provides. Thus, I can recommend them to others in need of similar BIM modelling services.
10 project areas together and discussed for some other future opportunities. Their engineering team is located abroad, however, the remote work is well-organized.
The design process always requires flexibility and capability to think differently, and we were pleased to see Eneca’s readiness to support us and solve all the project issues together. When there was a need to do some quick revisions at a very late stage, Eneca's specialists performed them in a high qualitative and timely manner. The technical competence and deep Tekla knowledge of Eneca’s team as well as their high-performance efficiency and always keen in continuous improvement, provided us an important support in our engineering process.
30.07.2021