Leroy Merlin shopping centre
Leroy Merlin Shopping Center.
This project involves the development of pre-design and design documentation for a Leroy Merlin shopping center, featuring a non-food retail shop and a catering facility.
Scope of Work:
-
Pre-Design Documentation:
- Feasibility study, including energy source selection.
- Sketch project preparation.
- Development of a Sanitary Protection Zone project.
-
Environmental Documentation:
- Preparation of Environmental Protection and Ecological Passport sections.
- Conducting an Environmental Impact Assessment (EIA).
-
Design Documentation:
- Creation of architectural project documentation.
- Development of the Construction Project.
- Coordination with state authorities to obtain a favorable conclusion from the State Construction and Environmental Expertise.
-
Construction Supervision:
- Author's supervision during the construction phase.
This comprehensive project ensures compliance with environmental and construction regulations while delivering a functional and sustainable retail facility.
Based on their experience, I can recommend Eneca.
Ridgway Facades has found the collaboration with Eneca Group to be constructive on various projects, including BIM modeling LOD 300-400 and drawings development.
Eneca's team effectively handled the BIM modeling of framing and curtain wall components in Autodesk Revit. The delivery across different BIM levels, as outlined in the BIM Execution Plan, met our expectations. The coordinated Revit models and COBie parameter input were completed as required.
We appreciate the professionalism demonstrated by Eneca Group throughout our partnership.
We appreciate Eneca’s readiness to support us with BIM modeling on short notice, as well as their flexibility in providing the necessary resources to meet a strict deadline. All modeling was completed within two weeks, with a division into lots. Eneca’s specialists were always willing to take the time to discuss our concerns and accommodate additional requests.
Eneca’s strong expertise in Revit and professional experience in structural design enabled their team to quickly grasp Implenia’s high modeling requirements. The BIM model was developed in accordance with the 3D BKP Model guidelines and Implenia’s standards, ensuring compliance with parameter and element naming rules as per Baukostenplan Hochbau. Eneca’s detail-oriented and structured approach contributed to the creation of a high-quality BKP model aimed at automating the calculation of construction volumes and costs.
I am pleased with the quality of services provided by ENECA and can confidently recommend them to others in need of similar BIM modeling services.