Mini-CHP plant
- Design of a mini-CHP with four boilers of superheated steam type KE-25 with a pre-furnace for burning wood waste with steam capacity of 25t/hour, steam pressure 4.0MPa.
- External engineering networks with the total length of about 4500m.
- Construction of a 2000m fuel transport system and an open fuel storage facility
- Reconstruction of the water intake station with replacement of pumps and laying of necessary engineering networks.
The object was designed in Revit.
Structural scope:
Concrete - 1480 m3
Steel structures - 749 tons
Software: Autodesk Revit
Services provided:
Structural design, MEP, BIM, Process design, Instrumentation
Based on their experience, I can recommend Eneca.
We appreciate Eneca’s readiness to support us with BIM modeling on short notice, as well as their flexibility in providing the necessary resources to meet a strict deadline. All modeling was completed within two weeks, with a division into lots. Eneca’s specialists were always willing to take the time to discuss our concerns and accommodate additional requests.
Eneca’s strong expertise in Revit and professional experience in structural design enabled their team to quickly grasp Implenia’s high modeling requirements. The BIM model was developed in accordance with the 3D BKP Model guidelines and Implenia’s standards, ensuring compliance with parameter and element naming rules as per Baukostenplan Hochbau. Eneca’s detail-oriented and structured approach contributed to the creation of a high-quality BKP model aimed at automating the calculation of construction volumes and costs.
I am pleased with the quality of services provided by ENECA and can confidently recommend them to others in need of similar BIM modeling services.
The design process always requires flexibility and capability to think differently, and we were pleased to see Eneca’s readiness to support us and solve all the project issues together. When there was a need to do some quick revisions at a very late stage, Eneca's specialists performed them in a high qualitative and timely manner. The technical competence and deep Tekla knowledge of Eneca’s team as well as their high-performance efficiency and always keen in continuous improvement, provided us an important support in our engineering process.
30.07.2021