Residential Building in Sweden
Precast Concrete Design for Krikonträdet, Malmö
Krikonträdet is a mixed-use residential development in Malmö, Sweden, forming part of the Nya Ellstorp district. The project comprises 241 rental apartments and two commercial units.
We focused on the 3D modeling and detailing of precast concrete elements, supporting coordination and production planning throughout the project.
Scope of Work:
- 3D modeling of element geometry, cast-in components and MEP interfaces
- Modeling of reinforcement and lifting details in Tekla Structures
- Collaboration in a shared project environment
- Preparation of detailed factory drawings for precast elements
- Clash coordination and resolution
Project at a Glance:
- 598 precast elements, including balconies and single-, double- and triple-layer walls
- Project duration: 7 months
- Project team: 3–4 people
Use our online cost calculator to estimate your concrete design project.
Based on their experience, I can recommend Eneca.
Ridgway Facades has found the collaboration with Eneca Group to be constructive on various projects, including BIM modeling LOD 300-400 and drawings development.
Eneca's team effectively handled the BIM modeling of framing and curtain wall components in Autodesk Revit. The delivery across different BIM levels, as outlined in the BIM Execution Plan, met our expectations. The coordinated Revit models and COBie parameter input were completed as required.
We appreciate the professionalism demonstrated by Eneca Group throughout our partnership.
We appreciate Eneca’s readiness to support us with BIM modeling on short notice, as well as their flexibility in providing the necessary resources to meet a strict deadline. All modeling was completed within two weeks, with a division into lots. Eneca’s specialists were always willing to take the time to discuss our concerns and accommodate additional requests.
Eneca’s strong expertise in Revit and professional experience in structural design enabled their team to quickly grasp Implenia’s high modeling requirements. The BIM model was developed in accordance with the 3D BKP Model guidelines and Implenia’s standards, ensuring compliance with parameter and element naming rules as per Baukostenplan Hochbau. Eneca’s detail-oriented and structured approach contributed to the creation of a high-quality BKP model aimed at automating the calculation of construction volumes and costs.
I am pleased with the quality of services provided by ENECA and can confidently recommend them to others in need of similar BIM modeling services.