Wood processing plant process piping
Dried timber, with a moisture content of 10±2%, is delivered to the wood processing workshop. The production process consists of two main technological streams:
- Production of planed products and standard construction materials
- Production of glued beams and joists
A material return system is designed to transfer excess material from the shaping machine back to the feeding conveyor. This includes two screw conveyors and a chain conveyor.
The facility is intended to operate continuously for 365 days a year, with scheduled maintenance for both main and auxiliary equipment. All machinery functions in an automated mode.
The supplied equipment is high-efficiency, featuring a streamlined automated production process controlled via a central software interface. All machinery is integrated into production lines provided by the suppliers.
For the internal movement of timber and finished products, multidirectional forklifts with a capacity of 5 tons and electric stackers with a capacity of 1.5 tons will be utilized.
Finished products will be loaded using a 5-ton capacity electric overhead crane, and transportation will be carried out by third-party freight vehicles.
Based on their experience, I can recommend Eneca.
Ridgway Facades has found the collaboration with Eneca Group to be constructive on various projects, including BIM modeling LOD 300-400 and drawings development.
Eneca's team effectively handled the BIM modeling of framing and curtain wall components in Autodesk Revit. The delivery across different BIM levels, as outlined in the BIM Execution Plan, met our expectations. The coordinated Revit models and COBie parameter input were completed as required.
We appreciate the professionalism demonstrated by Eneca Group throughout our partnership.
We appreciate Eneca’s readiness to support us with BIM modeling on short notice, as well as their flexibility in providing the necessary resources to meet a strict deadline. All modeling was completed within two weeks, with a division into lots. Eneca’s specialists were always willing to take the time to discuss our concerns and accommodate additional requests.
Eneca’s strong expertise in Revit and professional experience in structural design enabled their team to quickly grasp Implenia’s high modeling requirements. The BIM model was developed in accordance with the 3D BKP Model guidelines and Implenia’s standards, ensuring compliance with parameter and element naming rules as per Baukostenplan Hochbau. Eneca’s detail-oriented and structured approach contributed to the creation of a high-quality BKP model aimed at automating the calculation of construction volumes and costs.
I am pleased with the quality of services provided by ENECA and can confidently recommend them to others in need of similar BIM modeling services.