Find
Indoor skiing arena
Year
2020
Type
Commercial real estate


Category
Business centres
Key indicators
S=27 000 m2

Indoor skiing arena

This project involves the design of a state-of-the-art indoor arena designed to cater to cross-country skiing, snowboarding, and fitness activities.

Key Features

  • Cross-Country Ski Track

    • Length: Approximately 1.1 km
    • Elevation difference: 4.5 m
  • Snowboarding Slope

    • Length: 95 m.
    • Variable slope gradient: 14–27%
    • Equipped with a ribbon lift for convenience

Facility Layout

  • Ground Floor

    • Snowboard and skate issuance/preparation zone
    • Cafeteria: Seating for 50
    • Sports equipment shop
    • Auxiliary and security-access premises
  • First Floor

    • Changing rooms with showers
    • Ski equipment issuance and storage area
  • Third Floor

    • Fitness room and gym
    • Administrative offices
    • Technical premises

This multi-level arena offers a comprehensive experience for sports enthusiasts, providing high-quality skiing and snowboarding facilities alongside amenities for fitness, shopping, and dining.

they trust us
Client
Swisslux AG
Location
Under NDA
To make it easier for our customers to take the step into the future of construction, we found a competent and reliable partner in Eneca who understood our needs and was able to implement them quickly. As part of our order, Eneca took over the development of 56 parameterized lighting families in Revit with a high level of detail and information. All models were created in the three national languages ​​and in two formats each using Revit script. This means that future adjustments can also be implemented easily and without any problems. The Eneca team works professionally, quickly and precisely, which underlines their competence in BIM.
Based on their experience, I can recommend Eneca.
Client
Implenia Schweiz AG
Location
Under NDA

We worked with Eneca to create a structural Revit model of a residential complex having the floor area of 41 571 qm and consisting of 6 three-storey residential buildings with an underground car park out of 2D drawings.

We appreciate the readiness of Eneca to support us in BIM-modelling at a short notice, as well as their flexibility in providing us with the resources needed to meet a strict deadline. All the modelling was done with the division into lots in a short time within 2 weeks. Eneca’s specialists were always willing to take the time to discuss our concerns and work out additional requests.

The good knowledge of Revit and professional experience in structural design allowed Eneca’s team to quickly grasp high Implenia's modelling requirements. The BIM model was created according to 3D BKP Model guidelines and standards of Implenia including compliance to the parameters and element naming rules according to Baukostenplan Hochbau. The Eneca’s detail-oriented and organized approach helped to create a high-quality BKP model aimed at automating the calculation of construction volumes and costs.

I am pleased with the quality of the services ENECA provides. Thus, I can recommend them to others in need of similar BIM modelling services.

Client
ASK Romein Staalbouw BV
Location
Under NDA
We have been working closely with Eneca since June 2020. Eneca has proved itself as a trustworthy and responsible partner in steel structural design. We have accomplished more than
10 project areas together and discussed for some other future opportunities. Their engineering team is located abroad, however, the remote work is well-organized.

The design process always requires flexibility and capability to think differently, and we were pleased to see Eneca’s readiness to support us and solve all the project issues together. When there was a need to do some quick revisions at a very late stage, Eneca's specialists performed them in a high qualitative and timely manner. The technical competence and deep Tekla knowledge of Eneca’s team as well as their high-performance efficiency and always keen in continuous improvement, provided us an important support in our engineering process.

30.07.2021